Jaguar currently has three tailings storage facilities (“TSF”): the Moita Dam, the Turmalina Dam and the Paciência Dam. Each TSF has its own control and monitoring system, scaled according to the specific characteristics of each structure. All three structures are undergoing decharacterization (decommissioning): works are in progress at the Turmalina and Moita dams, and the detailed engineering design for the Paciência Dam is being prepared.
Jaguar trains and maintains its own team to constantly monitor the conditions of its dams and also hires external professionals specifically to advise the team on the care required for the proper maintenance of these structures. In addition, all structures are monitored remotely by satellite using InSAR radar technology.
Special attention is given to the Dam Safety Plan (Plano de Segurança de Barragens – PSB), which is kept up to date with the regulatory agencies and with the Jaguar team, who participate in training, inspections and emergency drills, always acting in a preventive manner in the management of these dams.
The RG2W Dam (Caeté – MG) has already been fully decharacterized. Completion was recognized by the Brazilian National Mining Agency (ANM) on January 3, 2025, when the ANM’s approval of the request for de-registration by decharacterization of the RG2W structure was published in the Federal Official Gazette (Diário Oficial da União), confirming that the structure no longer falls within the definition of a mining dam.